Sculpture Installation December 7-8, 2010
Above:rebar layout completed - December 7th.
Above: Pour of first level of the base December 8th.
Above: Finishing the first level of the sculpture base.
The first level of the sculpture base was poured december 8th. Installation of the sculpture uprights TBA.